在线看片亚洲国产|久久无码高潮喷吹免费|日韩一区二区在线观看|欧美激情在线精品一区二区|亚洲乱码中文字幕小综合国|午夜亚洲精品专区高潮日w|狠狠亚洲婷婷综合色香五月排名|国产在线无码视频一区二区三区

當(dāng)前位置: 首頁(yè) > 新聞資訊 > 公司新聞 正文

鋼筋綁扎搭接的機(jī)理是什么?

添加時(shí)間:2019-06-14      發(fā)布人:http://m.iheartcartagena.com

  鋼筋綁扎研磨的機(jī)理是鋼筋的錨固。但是由于搭接部分的鋼筋相互接觸,接觸面缺少足夠的混凝土包裹,缺少一定的抓地力??紤]到這一點(diǎn),研究人員經(jīng)過(guò)研究和實(shí)踐,引入了一個(gè)大于錨固長(zhǎng)度1倍的修正系數(shù)作為標(biāo)準(zhǔn)應(yīng)用的補(bǔ)償,即搭接接頭的長(zhǎng)度。因此,搭接長(zhǎng)度=錨固長(zhǎng)度×修正系數(shù)。
  The bonding and grinding mechanism of reinforcing bars is anchorage of reinforcing bars. However, due to the contact of the overlapping steel bars, the contact surface lacks enough concrete wrap and a certain grip force. In view of this, after research and practice, the researchers introduced a correction factor greater than 1 times the anchorage length to compensate for the standard application, that is, the length of lap joint. Therefore, lap length = anchorage length * correction factor.
  我們知道11g101-1的鋼筋搭接需要我們計(jì)算,應(yīng)該說(shuō)有點(diǎn)麻煩。但是,16g101-1的新版本要簡(jiǎn)單得多,直接提供表格,只要一對(duì)一的對(duì)應(yīng)就可以。16G101也是常用的結(jié)構(gòu)。
  We know that the overlap of 11g101-1 steel bar needs our calculation. It should be said that it is a bit troublesome. However, the new version of 16g101-1 is much simpler, providing tables directly, as long as one-to-one correspondence. 16G101 is also the most commonly used structure.
  表面層鋼筋與鋼框架的焊接或綁扎允許偏差應(yīng)符合表7.5.4-1的規(guī)定。
  The allowable deviation of welding or binding between surface steel bars and steel frames shall be in accordance with Table 7.5.4-1.
  表7.5.4-1表面鋼筋與鋼筋框架焊接或綁扎允許偏差(mm
  Table 7.5.4-1 Allowable deviation (mm) of welding or binding between surface steel bar and steel frame
  鋼筋焊接搭接長(zhǎng)度不小于5d(d為鋼筋直徑),單面焊接搭接長(zhǎng)度不小于10d。鋼筋綁扎搭接長(zhǎng)度不應(yīng)小于35d。
  The overlap length of steel bar welding is not less than 5 days (d is the diameter of steel bar), and the overlap length of single side welding is not less than 10 days. The overlap length of steel bar should not be less than 35 days.
  3.同一豎向截面上焊接或綁扎鋼筋的數(shù)量不得超過(guò)截面鋼筋總數(shù)的25%,相鄰鋼筋的焊接或綁扎接縫應(yīng)錯(cuò)開(kāi)500mm或1000mm??v向連續(xù)加固應(yīng)每隔30米在綁扎處設(shè)置一次。點(diǎn)擊這里下載施工技術(shù)
  3. The number of welded or bonded reinforcing bars on the same vertical section shall not exceed 25% of the total number of reinforcing bars on the section. The welded or bonded joints of adjacent reinforcing bars shall be staggered by 500 mm or 1000 mm. Longitudinal continuous reinforcement should be set at the binding site every 30 meters. Click here to download construction technology for free
  4. 路面、橋梁表面及加固框架上鋼筋安裝位置的允許偏差應(yīng)符合表7.5.4-2的規(guī)定。
  4. The allowable deviation of the installation position of reinforcing bars on pavement, bridge surface and reinforced frame should comply with Table 7.5.4-2.
  地下鐵道工程施工及驗(yàn)收規(guī)范gb50299 - 1999(2003版)> 5隧道開(kāi)挖方法明建筑鋼材加工和安裝> > 5.5(Ⅱ)鋼綁定
濟(jì)南鋼筋批發(fā)
  Code for Construction and Acceptance of Underground Railway Engineering gb50299 - 1999 (2003 edition)> 5 Tunnel Excavation Method for Open Building Steel Processing and Installation > 5.5 (II) Steel Binding
  鋼筋綁扎搭接長(zhǎng)度應(yīng)滿足設(shè)計(jì)要求,綁扎點(diǎn)應(yīng)滿足以下要求:
  The overlap length of steel bar should meet the design requirements, and the binding point should meet the following requirements:
  1鋼筋搭接時(shí),中間和兩端應(yīng)搭接三處,必須單獨(dú)搭接,再搭接交叉鋼筋;
  When the reinforcing bars are lapped, three places should be lapped at the middle and two ends, and the cross reinforcing bars must be lapped separately, and then the cross reinforcing bars should be lapped.
  主筋2根,分布筋2根,變形節(jié)處除2 ~ 3根骨架柱外,其余綁扎均可交叉;
  There are 2 main reinforcements and 2 distributed reinforcements. Except for 2 - 3 skeleton columns at the deformed joints, all the other bonds can be crossed.
  3主桿之間或雙向受力桿之間的交點(diǎn)應(yīng)全部綁扎;
  The intersection points between the main poles or the two-way bearing poles should be all tied up.
  4. 單腿箍筋與雙腿箍筋的角部應(yīng)在主腱交點(diǎn)處完全結(jié)扎,雙腿箍筋的直部與主腱交點(diǎn)可交叉結(jié)扎;
  4. The corner of single-leg stirrups and double-leg stirrups should be ligated completely at the junction of the main tendon, and the straight part of the double-leg stirrups and the junction of the main tendon can be cross-ligated.
  5. 墻體、立柱立柱與底板水平主桿的交接點(diǎn)必須綁扎牢固。懸臂梁較長(zhǎng)時(shí),交點(diǎn)必須焊好,必要時(shí)增加支撐;
  5. The joints of the wall, column and horizontal main pole of the floor must be firmly tied. When the cantilever beam is long, the intersection must be welded well and support should be added if necessary.
  除了兩排外,所有的鋼網(wǎng)片的交叉點(diǎn)都是被綁住的。中間部分的交叉口可以相互交錯(cuò)并牢固結(jié)合。
  Except for two rows, all the intersections of the steel mesh are tied. Intersections in the middle can be crisscrossed and firmly integrated.
上一條: 焊接鋼筋網(wǎng)需要注意什么?
下一條: 學(xué)鋼筋翻樣要做哪些準(zhǔn)備?
咨詢熱線: 13605413762